Trucks are Now Snow Ready

At our chimney fire call today, it was pretty obvious that the weather was not going to cooperate with us. The roads were slick and the snow was still falling. When we got back to the Fire Hall we decided to chain up the trucks. This is not a decision that we take lightly. It involves an extra hour of being on a cold, wet truck bay floor after the equipment has been cleaned and put back in service.

The chains are also hard on the floors, hard on the roads, and hard on the trucks themselves. Then, after the roads improve, someone has to return to the firehall and take them all apart again. All that work is worth it when we have to drive out on a cold, snowy slippery night.

In fact, it was only 30 minutes after we finished chaining up the trucks that we got our second call of the day. At that point all of the drivers felt pretty good about the time spent on the cold, wet truck bay floor.

Leave a Reply

Your email address will not be published. Required fields are marked *